DeutschEnglishEspañol
Current project
     

Castle bridge, Darmstadt

The worldwide first Plexiglas-timber structure

27m in length, 3,2m in heigth and 4,2m in width made of glulam timber and Plexiglas. A worldwide unique bridge construction as a result of the cooperation between the University of Darmstadt, Röhm Evonic Industries and HESS-WOHNWERK.

 



Loading of the bridge on the companies courtyard

     
  
© 2013 HESS TIMBER GmbH & Co. KG