MUSEUM FONDATION LOUIS VUITTON
MUSEUM FONDATION LOUIS VUITTON
PHOENIX CENTRAL PARK
PHOENIX CENTRAL PARK
BUNJIL PLACE
BUNJIL PLACE
WOODEN SPHERE
WOODEN SPHERE
La Seine Musicale
La Seine Musicale
Boola Katitjin
Boola Katitjin
Waste-to-Energy-Plant Leeds
Waste-to-Energy-Plant Leeds
Google KGX1
Google KGX1
International House Sydney
International House Sydney
King's College School Wimbledon
King's College School Wimbledon
ZDI MAINFRANKEN
ZDI MAINFRANKEN
© Stefan Verkerk, Auftragnehmerkombination EdesPoort
© Stefan Verkerk, Auftragnehmerkombination EdesPoort
© Stefan Verkerk, Auftragnehmerkombination EdesPoort

14.05.2023

Spectacular assembly at Ede-Wageningen station

On the weekend of 13 and 14 May, the first components of the canopy were installed above the platforms of the Ede-Wageningen station.

The construction consists of 23 triangles, each with a side length of 27 metres. The huge components were pre-assembled on the ground and then lifted into their final position with a crawler crane. This procedure allowed rail traffic to continue unhindered for the most part.

The remaining components of the roofing will be installed during a second assembly weekend in July.