References
TIMBER LIMITLESS
Frontón Gure Jokoa
Location
Orkoien, Navarra, SpainClient
MADERGIA
Architect
OFS office for sustainability
Construction period
2015
Status
Completed
Project category
Sport and Leisure, Glued laminated timberDetails
Glulam timber roof construction with beam length up to 12.5 m
- Wood species: Spruce
- Total volume: 37 m³ glued laminated timber
Product / Solution
Glued laminated timberAwards
- XIII Bienal Española de Arquitectura y urbanismo